Reference material
Leak test checklist
| Done | Task |
|---|---|
| □ | Test before walls close |
| □ | Verify vent and overflow at full fill |
| □ | Check pump prime and shutoff |
| □ | Inspect every pressure joint dry then wet |
| □ | Hold pressure with fixtures closed |
| □ | Test hot cycle and relief route |
| □ | Flood-test shower pan/drains |
| □ | Fill and dump grey tank |
| □ | Retest after first drive/rough road |
| □ | Install access panels only after pass |