Commissioning checklist
| Done | Task |
|---|---|
| □ | Verify all valves in correct position |
| □ | Measure usable fresh volume |
| □ | Measure fixture flow |
| □ | Record pump current/pressure behavior |
| □ | Verify city regulator/backflow |
| □ | Commission treatment stages |
| □ | Verify UV alarm and rated flow |
| □ | Test heater and mixing temperature |
| □ | Calibrate level sensors |
| □ | Photograph and save as-built drawing |