Reference material
Kitchen Build Order Checklist
Keep hidden systems accessible until they have been tested.
| Step | Complete |
|---|---|
| Finalize appliances | Create cabinet plan |
| Confirm plumbing and electrical routes | Build carcass |
| Dry-fit fridge, oven, drawers, and doors | Test all openings and service clearances |
| Secure cabinet | Route plumbing |
| Route electrical | Fit countertop and sink |
| Install appliances and drawer fronts | Install backsplash and upper storage |
| Test water and electrical | Load drawers and test retention |