Back home

Reference material

Installation checklist

DoneCheck
Cooling-load tests completed
A/C capacity and ambient rating verified
Structural cut/mount reviewed
Airbags/wiring/drainage located
Condenser intake/discharge separated
Evaporator supply/return unobstructed
Condensate works off-level
Refrigerant lines secured/insulated
DC cable/fuse/disconnect engineered
Terminals torqued and covered
Three-fan airflow loop tested
External cover/awning secured
Roof-vent/A/C control labeled
Front/middle/rear sensors installed
Service panels remain accessible

Use these reference sheets alongside the guide while planning your system.