Back home

Reference material

Commissioning tests

DoneTest / acceptance evidence
Polarity and source voltage verified
A/C voltage at full load recorded
Full-load current/thermal inspection passed
Supply/return temperature recorded
Condenser hot-air recirculation absent
Condensate drains in several parking angles
All fan combinations tested
Full-sun temperature by zone logged
Humidity trend logged
Battery reserve shutdown tested
Loss of shore/solar/charger tested
Sensor and communication failure tested
Roof exhaust OFF in A/C mode verified
Post-road vibration inspection passed

Use these reference sheets alongside the guide while planning your system.