Reference material
Commissioning checklist
| Done | Check |
|---|---|
| □ | All sources isolated before dead tests |
| □ | Polarity verified at each device |
| □ | No unintended positive-negative continuity |
| □ | Battery settings verified |
| □ | Each source tested alone |
| □ | Each branch energized separately |
| □ | High-load thermal test passed |
| □ | GFCI/RCD and transfer tested |
| □ | Baseline readings recorded |